Biogas Plant 450kW

BGA with 450kW power output and a small footprint for medium companies that have to pay attention to its size.
Can be used with or without ManureSystem.

Price: 365000 €
Capacity for Solids: 65000 l
Capacity for Slurry: 120000 l
Consumption per second for solids: 8 l
Consumption per second for slurry: 6 l
Maintenance costs: 225 €/Day
Dimensions: 20x30 m
Filling type: Silage, manure, liquid manure, potatoes, sugar beet, straw, hay
Manure System ready (for PC)
Seasons ready
Jeux
Farming Simulator 19
Manufacturer
VD Industries
Catégorie
Author
Size
45.84 MB
Version
1.0.0.0
Released
01.02.2021
Plateforme
PC/MAC, PS4, XB1
User Rating:
4.2 (1283)

Mod Powered By:


Screenshots



Social Media